What is going on

The relief valve must be on the top boiler pipe only, not the boiler out, and must be above the heat exchanger. The discharge line has to be piped to a safe location.

Likely causes

  • Relief valve connected to the boiler out
  • Shutoff valve installed between relief valve and boiler or in the discharge line

Check in this order

  1. Install the relief valve in a ¾" street elbow with a ¾" tee onto the top water pipe (Figure 12, page 18).
  2. Install the valve only with the spindle vertical.
  3. Run the discharge line to a safe disposal point, pitched downward from the valve, ending at least 6" above a floor drain where discharge is visible.
  4. Keep the discharge line as short as possible and the same size as the valve outlet along its length.
  5. Terminate the discharge plain, not threaded, in material rated for 375°F or greater.
  6. Do not pipe the discharge where freezing could occur, and do not install a shutoff valve or any obstruction in the line.
  7. After filling and pressurizing, lift the lever to test. If the valve does not discharge freely, replace it.

Applies to: All ECO Tec Series 3 piping layouts

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec Series 3 boiler manual, p. 58. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.