Inspect system piping and base insulation
What is going on
Inspect all piping for leaks after filling and again after the system has heated up. The base insulation must be secure on all four sides. Ceramic fiber and fiberglass materials must be handled with care.
Likely causes
- Damaged or displaced base insulation creating a fire hazard
Check in this order
- Inspect all piping for leaks after filling and repair any leak at once.
- Repeat the piping inspection after the boiler has run and the system has heated up.
- Check that base insulation is secure against all four sides of the base.
- If insulation is damaged or displaced, do not operate the boiler; replace or reposition it.
- Handle ceramic fiber and fiberglass per the instructions on page 91.
Applies to: EG / PEG water boilers before start-up
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: EG / PEG Series 7 boiler manual, p. 57. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.