Hydrostatic pressure test before piping and wiring
What is going on
Pressure test the boiler before connecting water, gas or electrical supply. The factory test is 1.5 times the maximum allowable working pressure. The on-site test pressure is 1.5 times the relief valve setting that will be installed. The relief valve is not installed until testing is done. Purge all air from the heat exchanger before testing. Do not leave the boiler unattended during a cold water fill. Do not use petroleum-based cleaners or sealants.
Check in this order
- Do not install the relief valve until testing is finished.
- Attach blind flanges with a nipple and valve at the supply and return, plus a water supply, hand pump and drain line.
- Remove the shipped P/T gauge, then remove the factory plug from the 1/4 inch tap on the supply pipe and install the gauge with pipe dope.
- Plug the relief valve nipple (1-1/4 inch FNPT on SVF 1500/2000, 2 inch FNPT on SVF 2500/3000).
- If the test exceeds 160 psig, remove the automatic air vent and install a 1/2 inch NPT plug.
- Open the supply and return shutoff valves and let water fill from the bottom until air exits the top. Ensure all air is out, then close the top valve.
- Close the water supply, raise pressure with the hand pump to the test value, then close the shutoff valve.
- Hold the test pressure for 10 minutes and confirm the gauge reading stays steady.
- Check threaded joints and repair leaks. If the heat exchanger leaks, contact Weil-McLain.
- Release pressure and drain safely, then reinstall the automatic air vent and P/T gauge if they were removed.
Applies to: All SVF 1500-3000 models
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF 1500-3000 Series 1 boiler manual, p. 12-13. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.