Rinnai · Boiler troubleshooting

Hydraulic separation and primary/secondary piping

I-Series Plus

What is going on

Rinnai requires hydraulic separation between the boiler and the central heating system so that two or more circulators can run independently.

Check in this order

  1. Use hydraulic separation between the boiler loop and the central heating loop.
  2. Use closely spaced tees or a low loss header as the separator.
  3. For closely spaced tees, keep the separation at the header to no more than four pipe diameters.
  4. On a low loss header, install the relief valve and shut-off valves between the boiler and the header.
  5. When the boiler is used with a Rinnai air handler, follow the air handler manual for installation and performance details.

Applies to: Primary/secondary piping and hydraulic separators

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 57-58. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.