Weil-McLain · Boiler troubleshooting
Glue PVC or CPVC vent and air joints
What is going on
Follow the pipe maker's instructions for prep and cement. The joint must be clean, primed and fully seated.
Check in this order
- Deburr inside and outside of each pipe end.
- Chamfer the outside of each pipe end so cement spreads evenly.
- Clean all pipe ends and fittings and let them dry.
- Handle parts carefully so the joint surfaces stay clean.
- Apply primer to the pipe end and the fitting socket while they are still wet.
- Apply cement to both surfaces while primer is damp. Apply a second coat, but do not use so much that cement builds up inside the socket.
- Push the pipe fully into the fitting with a quarter turn while the cement is wet.
- Wipe off excess cement and check for a smooth bead all the way around the joint.
Applies to: PVC and CPVC vent and air piping
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec Series 3 boiler manual, p. 32. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.