Gas supply piping installation

EG / PEG Series 7

What is going on

Size the gas line for diameter, length, fittings and maximum gas use. Follow the local code and ANSI Z223.1/NFPA 54 or CAN/CSA B149 for pressure drop. Use Table 11 for pipe capacity.

Check in this order

  1. Size the pipe for rated boiler input and any future expansion.
  2. Remove the knock-out disc from the jacket panel where the gas supply enters.
  3. Install a drip leg at the gas connection inlet; extend it to floor level if the local utility requires it.
  4. Install a ground joint union where needed for servicing.
  5. Install a manual shut-off valve outside the jacket per Figure 28 when local code requires it. In Canada the manual main shut-off valve must be identified by the installer.
  6. Apply pipe joint compound sparingly to pipe threads only.
  7. Support the piping with hangers, not by the boiler or its accessories.
  8. Purge all air from the piping.
  9. Check the boiler and its gas connection for leaks before operation.
  10. Use a bubble test for leaks. Never use an open flame.
  11. Close the manual main shut-off valve for any pressure test below 13 in. w.c.
  12. Disconnect the boiler and gas valve from the supply for any pressure test above 13 in. w.c.

Applies to: EG/PEG natural gas boilers

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: EG/PEG Series 7 boiler manual, p. 29. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.