Weil-McLain · Boiler troubleshooting
Flow switch or combustion air damper interlock
What is going on
Proof of closure can be a flow switch or a CAD interlock. Both are wired through the J18 jumper location.
Check in this order
- Remove the jumper on J18 and wire the flow switch or CAD contacts in place of it, as shown in the wiring diagram.
- For a flow switch, no control settings are needed.
- For a CAD interlock, assign Input 3 as an AUX PUMP/OUTPUT, and select local or System Damper for the operating mode.
- Confirm the damper will open whenever the boiler is called to fire. Output 3 supplies 120VAC to the damper motor. Use an isolation relay for a different voltage or for loads above 2.0 A.
- On multi-boiler CAD interlocks, wire all proof of closure inputs in series with the end devices and each boiler's closure switch input.
- Use only electrically isolated contacts, since the J18 jumper circuit carries 5 VDC.
Applies to: Evergreen 110/155/220/299/300/399
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Series 2 Condensing Gas Boiler Advanced Manual, p. 52. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.