Weil-McLain · Boiler troubleshooting
Floor foundation and flooring requirements
What is going on
Requirements for floor-standing installations using the pedestal kit.
Check in this order
- Never install the boiler on carpeting, even when a foundation is used.
- Use a solid foundation pad at least 2 inches above the floor if the floor can flood, is dirt, sand, gravel or loose material, or the mounting area is badly uneven or sloped.
- Minimum foundation size for ECO Tec is 20 inches wide by 20 inches deep.
- Foundation may be wood, brick or concrete, at least 2 inches thick.
- If flooding is possible, raise the boiler high enough that water cannot reach it.
Applies to: Floor-standing installations with pedestal kit
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec Series 3 boiler manual, p. 13. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.