Weil-McLain · Boiler troubleshooting

First-year special inspection

ECO Tec Series 3

What is going on

Extra inspection due no later than 12 months after installation.

Likely causes

  • Heavy fouling of heat exchanger or condensate lines
  • Combustion air contamination

Check in this order

  1. Obtain a Weil-McLain maintenance kit before starting.
  2. Inspect the heat exchanger and clean if needed (p. 150).
  3. Inspect the cover plate insulation and gasket; replace if not in good condition.
  4. Inspect the burner and clean it with a vacuum and compressed air if needed.
  5. Make sure there is no blockage or debris in the burner or burner ports; replace the burner if needed.
  6. Check burner tightness. Remove cover plate insulation and tighten burner screws if needed (p. 151).
  7. Check the vent seals with the mirror method (p. 136).
  8. Disconnect the condensate trap and drain lines, inspect and flush, then reinstall and refill the trap (p. 132).
  9. If the heat exchanger is heavily fouled or condensate lines show sediment, schedule a follow-up inspection sooner than 12 months.
  10. If heavy fouling suggests combustion air contamination, inspect the air intake area and remove contaminants (p. 25).

Applies to: ECO Tec Series 3 gas boilers

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec series 3 boiler manual, p. 139. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.