Example D high mass boiler with isolation heat exchanger
What is going on
Condensing boilers run during low-load periods such as spring and fall. A high-mass boiler is added for high-load periods. The control sequences the high-mass boiler in when it is needed, through the additional heat demand input.
Check in this order
- Pipe the isolation heat exchanger and high-mass boiler as shown in Figure 15.
- Install unions where recommended, drain valves at 3/4 inch NPT or larger, and the boiler T&P gauge.
- Provide a strainer on each boiler return line where recommended.
- Place immersion sensors on the supply and return at least 6 pipe diameters, and no more than 3 feet, from the boiler connection tees.
- Confirm the control sequences the high-mass boiler when needed.
Applies to: Example D multi-boiler with isolation heat exchanger and high-mass boiler
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Series 2 Condensing Gas Boiler Advanced Manual, p. 31. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.