Electrical supply and line voltage
What is going on
Line voltage wiring requirements for the U-Control boiler.
Check in this order
- Turn off power at the service entrance panel before any connection.
- Provide a fused disconnect or service switch, 15 A rated recommended, as code requires.
- Connect at least a 15 A, 120 VAC supply to the boiler line voltage terminal strip.
- Wiring must be N.E.C. Class 1.
- If the factory wiring must be replaced, use 105 °C wire or equivalent.
- Ground the boiler as required by NEC ANSI/NFPA 70 and local codes.
- In Canada, follow CSA C22.1 Canadian Electrical Code Part 1 and local codes.
Applies to: Ultra U-Control line voltage
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Ultra Series 4 boiler manual, p. 94. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.