Weil-McLain · Boiler troubleshooting

Direct vent vertical vent / sidewall air: vent termination

Ultra Series 4

What is going on

The vent pipe ends in an up-turned coupling with the top at least 1 ft above the air intake. Keep it at least 6 ft from adjacent walls, 5 ft below a roof overhang, 3 ft above any forced air intake within 10 ft, and 12 in below or horizontally from any door, window or gravity inlet. Keep it at least 4 ft horizontally from meters, regulators and relief valves. Do not terminate above a door or window.

Check in this order

  1. Make a vent pipe penetration hole at least 0.4 in larger than the pipe: 2-3/4 in for 2 in pipe, 4 in for 3 in pipe, 5 in for 4 in pipe.
  2. Insert a galvanized metal thimble in the vent pipe hole.
  3. Insert a bird screen into the up-turned coupling. Buy the screen separately if it is not included.
  4. For 3 in piping on an Ultra-230, cut a 4 in bird screen using the 3 in fitting as a template.
  5. Keep the finished termination dimensions as shown in the termination figure.
  6. When several boilers share a wall, keep adjacent terminations at least 6 in apart.

Applies to: Direct vent vertical vent / sidewall air configuration

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ultra Series 4 boiler manual, p. 79-80. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.