Vent and air terminations through the roof must meet fixed heights and spacings. Air pipe ends in a down-turned 180-degree return bend with its edge at least 12 in above roof or snow line. Vent pipe ends in an up-turned coupling whose top is at least 12 in above the air intake to keep flue products out of the combustion air. Adjacent vent pipes of other boilers need 12 in minimum clearance on US installs. Canadian installs follow CSA B149 and a ULC S636 kit.

Check in this order

  1. Set the air return bend edge at least 12 in above roof or snow line.
  2. Set the vent up-turned coupling top at least 12 in above the air intake.
  3. Keep at least 12 in vertically from vent outlet to any air inlet.
  4. Keep at least 12 in between adjacent vent pipes of other boilers (US).
  5. Keep all vent outlets for multiple boilers at the same height.
  6. Maintain the finished termination dimensions shown in the manual figure.

Applies to: 80/110/150/199 Series 3 direct vent

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec Series 3 Boiler Manual, p. 40. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.