Weil-McLain · Boiler troubleshooting
Cycle boiler with thermostat
What is going on
Checks that the boiler responds correctly to the room thermostat at both ends of its range.
Check in this order
- Raise the thermostat to its highest setting and confirm the boiler goes through a normal start-up cycle.
- Lower the thermostat to its lowest setting and confirm the boiler shuts off.
Applies to: EG and PEG Series 7 boilers
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain EG/PEG Series 7 Boiler Manual, p. 65. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.