Weil-McLain · Boiler troubleshooting
Converting the boiler from natural gas to propane
What is going on
The boiler ships set for natural gas and needs a propane orifice for propane. Use only the orifice in the conversion kit, which is 0.660 inch and marked for this boiler size. The conversion must be done with the electrical supply off and the external manual gas valve closed. After conversion, start up and test the boiler to check combustion. High altitude installs use the control's High Altitude option (Figure 67, page 75).
Check in this order
- Turn off power and the external manual gas shut-off valve; let the boiler cool if it was running.
- Verify the orifice disk stamping is correct for the model size and reads 0.660 inch.
- Remove the left front side panel.
- Remove the gas manifold four M5 bolts at the mixing system/blower (7mm Allen) and four M8 bolts at the gas valve (13mm socket or wrench).
- Inspect the gas valve and mixing system/blower O-rings and replace if damaged.
- Install the propane orifice in the groove.
- Reinstall the manifold, making sure both O-rings are in place, and tighten the M5 and M8 bolts.
- Confirm flanges are flat to mounting surfaces with no gaps, then reconnect power.
- Set the control to LP GAS in the Wizard or boiler settings menu.
- Start up, test and adjust the boiler, including the flame and combustion checks on page 88.
- Apply the conversion label next to the rating label.
Applies to: SVF 1500/2000/2500/3000 converting to propane
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF 1500-3000 Series 1 boiler manual, p. 12. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.