Weil-McLain · Boiler troubleshooting
Connecting PVC/ABS vent or air pipe to the boiler adapter
What is going on
Vent and air pipe connect to the boiler with a clamped adapter that seals on an internal gasket. The clamp only holds the pipe.
Check in this order
- Clean and chamfer the insertion end of the pipe and deburr its inside edge.
- Deburr and clean the inside and outside of the other end.
- Check the adapter for obstructions or foreign objects.
- Loosen the adapter clamp screw.
- Mark the pipe 3-1/2 inches from its end with a felt-tip pen.
- Put a small amount of silicone grease on the pipe end.
- Insert the pipe into the adapter and slide it down to the 3-1/2 inch mark.
- Tighten the clamp securely without overtightening, since the internal gasket provides the seal.
- Do not force or bend the adapter or pipe during insertion.
Applies to: Ultra vent and air connections
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Ultra Series 4 boiler manual, p. 91. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.