Weil-McLain · Boiler troubleshooting

Connect vent and air pipe at the boiler

ECO Tec Series 3

What is going on

Work from the boiler outward to the termination. Use the adapters and connection sizes given for the pipe material in use.

Check in this order

  1. Read the termination instructions and the vent pipe maker's instructions before starting.
  2. Use only the vent materials listed for the job. Air inlet connection is 3 in PVC only.
  3. Use 3 in PVC, CPVC, SS (Simpson-Duravent only) or PP (Simpson-Duravent and Centrotherm) at the vent connection. Use transitions for other materials or for 2 in pipe.
  4. Cut pipe to length. Dry-fit the full vent or air run before gluing any joint.
  5. Deburr and clean both ends. Chamfer the boiler end of the vent pipe so it does not damage the adapter gasket.
  6. Inspect the adapter for obstructions or debris.
  7. Loosen the adapter clamp screw, mark the pipe at the insertion depth for its material, and lightly grease the pipe end.
  8. Push the pipe in until the mark meets the adapter. Do not force it or bend the adapter.
  9. Tighten the clamp firmly but not too tight. The internal gasket makes the seal; the clamp only holds the pipe.

Applies to: ECO Tec Series 3 wall-mount boilers, all vent and air connections

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec Series 3 boiler manual, p. 32. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.