Rinnai · Boiler troubleshooting

Connect the condensate drain pipe

I-Series Plus

What is going on

Threads the 1/2 in. NPT drain fitting onto the boiler and prepares for the pump safety wiring.

Check in this order

  1. Apply thread sealant to the 1/2 in. NPT condensate drain port.
  2. Thread the 1/2 in. NPT fitting on by hand.
  3. Do not use a wrench on the drain connection, as it can break the joint.
  4. Wire the condensate pump safety switch if a pump is used.

Applies to: I-Series Plus condensing combi boilers

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Rinnai I-Series Plus IP060160C installation manual, p. 65. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.