Weil-McLain · Boiler troubleshooting
Connect PVC/ABS vent or air pipe to the boiler adapter
What is going on
Use a smooth, chamfered pipe end so the adapter gasket seals. The clamp only holds the pipe; the seal comes from the internal gasket.
Check in this order
- Cut the pipe square, then clean and chamfer the insertion end. Deburr the inside of the insertion end and clean and deburr both ends.
- Check the adapter for obstructions or foreign objects.
- Loosen the adapter clamp screw.
- Measure 3-1/2 inches from the pipe end and mark it.
- Apply a small amount of silicone grease to the pipe end.
- Insert the pipe into the adapter and slide it down until the 3-1/2 inch mark reaches the adapter.
- Tighten the adapter clamp securely but do not overtighten.
- Do not force the pipe or bend the adapter when inserting.
Applies to: Ultra boiler vent and air connectors
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Ultra Series 4 boiler manual, p. 71. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.