Weil-McLain · Boiler troubleshooting

Connect gas supply piping

Ultra Series 4

What is going on

Gas piping must be supported and leak-tested, and the gas valve outlet must not be adjusted.

Check in this order

  1. Remove the jacket front panel and pipe gas to the boiler per Figure 33.
  2. Install a ground joint union for service where required.
  3. Install a manual shutoff valve outside the jacket where local code or the utility requires it. In Canada, the installer must identify the main manual shutoff valve.
  4. For wall-mounted boilers, follow the separate wall-mounting instructions; gas may enter from the bottom.
  5. Support the piping with hangers, not by the boiler or its accessories.
  6. Use two wrenches so the boiler gas connection does not turn.
  7. Purge all air from the gas supply piping.
  8. Check the boiler and its gas connection for leaks before operation.
  9. Check the inlet pressure at the test port (Figure 39, 40 or 41, pages 40-41).
  10. Do not adjust or measure the gas valve outlet pressure; the valve is factory set for natural gas and propane.

Applies to: All Ultra models gas connection

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Ultra Series 4 boiler manual, p. 29. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.