Weil-McLain · Boiler troubleshooting

Connect condensate trap line

Ultra Series 4

What is going on

Hose clamps secure the trap line. The method changes between the smaller Ultra-80 and -105 and the Ultra-155 and larger.

Check in this order

  1. Ultra-80 and -105 guide the trap line through the bracket hole.
  2. Ultra-80 and -105 clamp one end to the heat exchanger condensate connection, then clamp the other end over the reducing elbow.
  3. Ultra-155 and larger slide a hose clamp over each end of the trap line.
  4. Ultra-155 and larger slide the trap line onto the heat exchanger connection and the PVC reducing elbow, then tighten both clamps (Figure 30 or 31, page 28).

Applies to: All Ultra models

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Ultra Series 4 boiler manual, p. 27. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.