Weil-McLain · Boiler troubleshooting
Confirm start-up readiness before operating
What is going on
Do not run the boiler until the boiler and system are full of water and all earlier procedures are complete. Read the operating instructions first and use the one that matches the installed gas valve.
Check in this order
- Verify the boiler and system are full of water.
- Verify the start-up preparation procedures on page 56 are complete.
- Read the operating instructions (page 35) and use only the one for the installed gas valve.
- Remove the boiler jacket door and note the gas valve manufacturer and model number.
- Follow the operating instructions to start the boiler.
Applies to: EG / PEG water boilers
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: EG / PEG Series 7 boiler manual, p. 58. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.