Weil-McLain · Boiler troubleshooting

Concentric vent/air termination (vertical through roof)

ECO Tec Series 3

What is going on

Concentric termination must be assembled and installed before the piping from the boiler is connected. It needs proper roof flashing, supports and a rain cap. Support must prevent slipping and sideways movement without crushing the pipe or drilling into vent or air piping.

Check in this order

  1. Cut the roof hole to clear the termination outside diameter per kit instructions and install a corrosion-resistant metal thimble.
  2. Install flashing and sealing boot sized for the termination.
  3. Assemble the termination and mount it with supports so it cannot slip or move sideways.
  4. Do not clamp the outer pipe with sharp-edged clamps that could crack it.
  5. Do not drill or screw into vent or air pipe or fittings.
  6. Keep the termination 12 in min above snow line (18 in min for Canada).
  7. Install the bird screen and cement the rain cap only after the assembly is through the roof and supported.

Applies to: Vertical concentric PVC kit

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec Series 3 Boiler Manual, p. 41-42. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.