Support the vent and air piping so the weight does not rest on boiler fittings. Pipe must be supported well enough that the termination cannot slip or move. Clamps must not cut into the pipe.

Check in this order

  1. Install pipe supports at least every 5 ft on horizontal and vertical runs.
  2. Install a hanger within 6 in of any upturn in the piping.
  3. Slope horizontal piping down toward the boiler at least 1/4 in per foot.
  4. Rotate the concentric Y-fitting about 30 degrees so pipe centers match those at the boiler.
  5. Install the concentric termination before running piping from the boiler to it.
  6. Do not drill or screw into the vent or air pipe.

Applies to: Sidewall and vertical 3 in or 4 in concentric termination

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ultra Series 4 boiler manual, p. 74, 76-77. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.