Weil-McLain · Boiler troubleshooting
Clean heat exchanger, pin side
What is going on
Procedure to shut down the boiler and open it for pin-side heat exchanger cleaning. Ceramic fiber materials are present.
Check in this order
- Follow the 'To Turn Off Gas to Appliance' instructions on the boiler and the lighting instructions.
- Do not drain the boiler unless it will be exposed to freezing; do not drain if freeze prevention fluid is in the system.
- Let the boiler cool to room temperature if it has been firing.
- Remove the boiler door by removing the two screws at the lower front; lift it off.
- Follow the Ultra-80/105 access procedure (page 126) or the Ultra-155 to 399 procedure (page 127).
Applies to: Ultra Series 4 boilers, all sizes
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Ultra Series 4 boiler manual, p. 125. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.