Weil-McLain · Boiler troubleshooting

Clean heat exchanger, pin side

Ultra Series 4

What is going on

Procedure to shut down the boiler and open it for pin-side heat exchanger cleaning. Ceramic fiber materials are present.

Check in this order

  1. Follow the 'To Turn Off Gas to Appliance' instructions on the boiler and the lighting instructions.
  2. Do not drain the boiler unless it will be exposed to freezing; do not drain if freeze prevention fluid is in the system.
  3. Let the boiler cool to room temperature if it has been firing.
  4. Remove the boiler door by removing the two screws at the lower front; lift it off.
  5. Follow the Ultra-80/105 access procedure (page 126) or the Ultra-155 to 399 procedure (page 127).

Applies to: Ultra Series 4 boilers, all sizes

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ultra Series 4 boiler manual, p. 125. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.