Weil-McLain · Boiler troubleshooting
Circulator control and expansion for more zones
What is going on
The control can run up to four circulators: the boiler circulator plus three others.
Check in this order
- Wire circulators per the field wiring section (page 59).
- Set each input's priority to match its load, using the default Space Heating Priority 2 unless DHW needs a different priority.
- For more than 3 zones with zone valves, add a Weil-McLain WMZV zone valve controller.
- For more than 3 zones with circulators, add a Weil-McLain WMCR zone circulator controller.
Applies to: SVF 1500-3000 Series 1
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF Series 1 boiler manual, p. 17, 18, 21, 22. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.