Choose the vent and air termination method
What is going on
Vent and air must exit through the sidewall or roof using only one of the methods described in this manual.
Check in this order
- Sidewall top option Weil-McLain termination cap (kit ships with boiler).
- Sidewall middle option concentric PVC pipe (special kit required).
- Sidewall bottom option separate air pipe and vent pipe.
- Vertical top option concentric PVC pipe (special kit required).
- Vertical bottom option separate air pipe and vent pipe.
- Make each vent and air pipe at least 2 feet long, with 2 elbows for sidewall venting or 1 elbow for vertical venting.
- Select pipe diameters from Figure 12 on page 18.
Applies to: All Ultra Series 4 boilers
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Ultra Series 4 boiler manual, p. 66. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.