Rinnai · Boiler troubleshooting

Choose an installation location

I-Series Plus

What is going on

Confirm the location meets clearances, air quality, water quality, electrical and vent length limits before mounting.

Check in this order

  1. Confirm the air around the boiler and vent terminations is free of corrosive compounds such as aerosols, solvents, bleach and refrigerants.
  2. Confirm the planned location meets the clearances in the clearance table.
  3. Confirm the water supply does not exceed the contaminant limits.
  4. Confirm a properly grounded 120 VAC, 60 Hz outlet is available.
  5. Confirm the installation meets local codes, or the National Fuel Gas Code and CSA B149.1 where no local code applies.

Applies to: I-Series Plus condensing combi boiler

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Rinnai I-Series Plus IP060160C installation manual, p. 19. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.