Rinnai · Boiler troubleshooting
Choose an installation location
What is going on
Confirm the location meets clearances, air quality, water quality, electrical and vent length limits before mounting.
Check in this order
- Confirm the air around the boiler and vent terminations is free of corrosive compounds such as aerosols, solvents, bleach and refrigerants.
- Confirm the planned location meets the clearances in the clearance table.
- Confirm the water supply does not exceed the contaminant limits.
- Confirm a properly grounded 120 VAC, 60 Hz outlet is available.
- Confirm the installation meets local codes, or the National Fuel Gas Code and CSA B149.1 where no local code applies.
Applies to: I-Series Plus condensing combi boiler
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Rinnai I-Series Plus IP060160C installation manual, p. 19. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.