What is going on

The chilled medium is piped in parallel with the boiler and kept out of the boiler with valves.

Check in this order

  1. Pipe the chilled medium in parallel with the heating boiler.
  2. Install valves that keep the chilled medium out of the boiler, with balancing and check valves as shown.
  3. If the coils are in air handlers exposed to refrigerated air, add flow control valves or another automatic means to stop gravity circulation during cooling.
  4. Use a separate circulator for the chilled water loop if the space heating system is zoned with circulators.
  5. Consider antifreeze effects on circulator sizing and DHW performance.

Applies to: Chilled water systems

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ultra Series 4 boiler manual 550-100-440/1025, p. 55. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.