Build separate-pipe vertical and sidewall terminations

Ultra Series 4

What is going on

Terminations use bird screens (bought separately) and fixed dimensions. Air intake and vent outlet must face the right way and sit at the right height.

Check in this order

  1. Fit bird screens into the vent termination elbow and air termination elbow. Screens are sold separately; see the parts list.
  2. On Ultra-230 with 3 in piping, cut the 4 in bird screen by using the 3 in fitting as a template.
  3. End the air pipe in a down-turned 180-degree return bend. The air intake edge must be at least 12 in above roof or snow line.
  4. End the vent pipe in an up-turned coupling so flue products do not recirculate into the combustion air.
  5. Hold the finished termination dimensions shown in Figure 22, page 23.
  6. Do not extend exposed vent pipe outside the building beyond what the drawings show, because condensate can freeze and block it.

Applies to: Separate vent and air pipe terminations

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Ultra Series 4 boiler manual, p. 24. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.