Boiler 120VAC power supply wiring

Evergreen Series 2

What is going on

Main boiler power feed on terminal strip T1. Models 110/155 draw under 12 A. Models 220-399 need the load worksheet to size the supply.

Check in this order

  1. Install a fused disconnect or service switch sized to code (15 A for most cases).
  2. On 220-399 models, complete the total load worksheet (boiler and pump, outputs 1-4, receptacle) before sizing the supply.
  3. Run 120VAC supply to terminal block T1 and connect hot, neutral and ground.
  4. Ground the boiler to the T1 ground terminal. Improper grounding can cause abnormal operation and hazards.
  5. Fit a surge suppressor on the supply line if possible.

Applies to: Evergreen 110/155/220/299/300/399

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Series 2 Condensing Gas Boiler Advanced Manual, p. 48. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.