Weil-McLain · Boiler troubleshooting
Blower calibration at first startup
What is going on
The control calibrates the blower motor to the vent length and other installation factors so blower speed is right for all operation. Calibration runs before the boiler will fire.
Likely causes
- Blower must be calibrated before normal operation to match vent length and installation factors.
Check in this order
- Confirm the vent system is installed correctly and the boiler is fully assembled.
- Make sure the vent pipe is clear of obstructions.
- Confirm the boiler jacket door is installed.
- Press START CALIBRATION and then the right arrow.
- Wait while the blower calibrates, starting at its highest range and working down; the screen shows the blower percentage.
- If SKIP CALIBRATION is chosen, the boiler will not run until calibration is done; it can be done later from the Boiler Settings screen in the Contractor menu.
Applies to: ECO Tec control, first startup after installation
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: ECO Tec Series 3 boiler manual, p. 96. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.