Weil-McLain · Boiler troubleshooting

Before servicing the boiler

Ultra Series 4

What is going on

Safety checks to complete before any maintenance work on the Ultra boiler.

Check in this order

  1. Disconnect all electrical supplies to the boiler before maintenance to avoid electric shock.
  2. Let the boiler cool fully before working on it to avoid severe burns.
  3. Note that the boiler contains ceramic fiber and fiberglass materials and follow the warning and handling instructions on page 109.

Applies to: Ultra Series 4 boilers

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Series 4 gas-fired water boiler manual, p. 4. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.