Basic field wiring checklist

Ultra Series 4

What is going on

Turn off power at the service entrance panel before any connection. Wiring must follow the National Electrical Code or the CSA C22.1 Canadian Electrical Code and local rules.

Check in this order

  1. Turn off power at the service entrance panel.
  2. Use N.E.C. Class 1 wiring.
  3. Bond and ground the boiler as the code requires.
  4. Install a fused disconnect or service switch (15 A recommended).
  5. Connect 120 VAC, minimum 15 A, to the line voltage terminal strip (Figure 34, page 31).
  6. Wire up to three circulators; the boiler circulator is required.
  7. Use only the plug-in, color-coded terminal strips for field wiring.
  8. Connect thermostats or heat demand contacts.
  9. Install the system supply and return sensors and the outdoor sensor where used (see page 31).

Applies to: Basic installation wiring

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Ultra Series 4 boiler manual, p. 30. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.