Weil-McLain · Boiler troubleshooting

Assemble pedestal floor stand and mount boiler

ECO Tec Series 3

What is going on

Assemble the two stand sections, attach them to the boiler cabinet, then level the boiler. Hardware differs by model, so check the mounting hole designations for the model.

Check in this order

  1. Remove the back section of the floor stand kit and lay it on its back.
  2. Set the front section over the back section and secure with the 3/8 in screws, nuts and washers. Hand tighten only at this stage.
  3. Install the leveling legs into the rivets on the bottom of the stand and screw them fully in without overtightening.
  4. Hand install four 5/16 in studs into the rivet nuts on the bottom of the boiler cabinet, short threaded end in.
  5. Position the stand over the studs against the cabinet bottom and secure with four 5/16 in nuts. Do not overtighten.
  6. Align the sides and curved corners of the stand with the cabinet and door.
  7. Install the condensate trap assembly before lifting the boiler.
  8. Fully tighten all stand nuts, then lift the boiler upright with help.
  9. Level the boiler by adjusting the leveling legs.
  10. Install the floor stand door on the front section.

Applies to: ECO Tec 80/110/150/199 Series 3 pedestal stand

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO Tec Series 3 Boiler Manual, p. 16. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.