Weil-McLain · Boiler troubleshooting
Annual shut-down procedure
What is going on
Shut the boiler down for an extended period while protecting the piping from freezing.
Check in this order
- Follow the correct operating instructions on the boiler to shut it down.
- Do not drain the system unless it will be exposed to freezing temperatures.
- If antifreeze is used in the system, do not drain it; test the antifreeze instead.
- If the boiler and piping must be drained to avoid freezing, drain water from both ends of the boiler at or below the return tapping level.
Applies to: EG and PEG Series 7 boilers
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: EG / PEG Series 7 Boiler Manual, p. 72. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.