Carrier · Air handler troubleshooting
Upflow coil installation
What is going on
The cased coil sits directly on the furnace discharge opening. It must be level and does not need screws to the furnace.
Check in this order
- Set the coil on the upflow furnace discharge opening.
- Level the coil so condensate drains correctly. Do not tilt it toward the drain.
- If a wider coil sits on a narrower furnace, build a field adapter and fit it.
Applies to: D5FULA upflow installs
More air handler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Carrier D5FULA installation instructions, p. 20. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.