Carrier · Air handler troubleshooting
Cased coil installation on a furnace
What is going on
Cased coil is fitted to the furnace supply side with the furnace power off. Duct is reconnected and the joints are sealed.
Check in this order
- Turn off or disconnect power to the gas furnace and remove gas piping if needed.
- Remove enough supply ductwork to make room for the cased coil.
- Level the coil and seal the gap between coil and furnace. If the sizes do not match, fill the gap with sheet metal or similar material and seal it airtight.
- Reconnect the ductwork to the coil casing and seal any leaks.
- Reconnect furnace power, turn the furnace on and check all joints for leaks.
Applies to: D5FULA cased evaporator coils on gas furnaces
More air handler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Carrier D5FULA installation instructions, p. 17. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.