Carrier · Air handler troubleshooting
Select location: separation, grounding and return air
What is going on
Location rules for the indoor unit, including return air and garage installs.
Check in this order
- Keep indoor and outdoor units, cables and wires at least 1 m (3-1/5 ft) from televisions or radios to avoid static or image distortion. This may not be enough for some appliances.
- Electrically ground the indoor unit per national and local electrical code.
- Mount on a structure that can support the unit weight.
- Do not install in a moist environment; moisture corrodes parts and can cause shorts.
- Do not install where there are corrosive gases, oil drilling, coastal salt, strong electromagnetic waves, or stored flammable materials or gas.
- For a garage installation, place the heating elements at least 18 in (46 cm) above the floor.
- Make an airtight seal between the bottom of the air handler and the return air plenum using fiberglass strips, foil tape, caulking or an equal method.
- Do not draw return air from a room with a gas appliance, water heater, or carbon-monoxide-producing device such as a wood fireplace.
Applies to: Indoor air handler
More air handler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Carrier D5FSAAH / D5FLAAH installation manual, p. 15. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.