Carrier · Air handler troubleshooting
Refrigerant line cutting, flaring and connection
What is going on
Field preparation and connection of copper refrigerant lines to the air handler.
Check in this order
- Measure the run between indoor and outdoor units and cut the pipe slightly long, square to 90°.
- Remove all burrs with a reamer or deburring tool while holding the pipe pointing down.
- Seal pipe ends with PVC tape until flaring.
- Sheath the pipe with insulation.
- Place flare nuts on both ends facing the correct direction before flaring.
- Remove the PVC tape, clamp the flare block so the pipe extends past the form, and flare per Table 24 dimensions.
- Inspect the flare for cracks and even shape.
- Connect outdoor unit pipes first, then indoor unit. Connect low-pressure line first, then high-pressure line.
- Apply a thin coat of refrigeration oil to flared ends.
- Align the pipe centers, tighten the flare nut by hand, then torque it per Table 24 with a backup wrench.
- Wrap power cable, signal cable and piping together with binding tape, keeping the signal cable separate from other wiring.
- Thread the line set through the wall to the indoor unit.
- Bend tubing only with a correctly sized bender; do not bend more than 90° or more than 3 times.
Applies to: D5FUAA refrigerant piping
More air handler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: D5FUAA installation instructions, p. 39-40. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.