Carrier · Air handler troubleshooting

Refrigerant line cutting, flaring and connection

D5FUAA

What is going on

Field preparation and connection of copper refrigerant lines to the air handler.

Check in this order

  1. Measure the run between indoor and outdoor units and cut the pipe slightly long, square to 90°.
  2. Remove all burrs with a reamer or deburring tool while holding the pipe pointing down.
  3. Seal pipe ends with PVC tape until flaring.
  4. Sheath the pipe with insulation.
  5. Place flare nuts on both ends facing the correct direction before flaring.
  6. Remove the PVC tape, clamp the flare block so the pipe extends past the form, and flare per Table 24 dimensions.
  7. Inspect the flare for cracks and even shape.
  8. Connect outdoor unit pipes first, then indoor unit. Connect low-pressure line first, then high-pressure line.
  9. Apply a thin coat of refrigeration oil to flared ends.
  10. Align the pipe centers, tighten the flare nut by hand, then torque it per Table 24 with a backup wrench.
  11. Wrap power cable, signal cable and piping together with binding tape, keeping the signal cable separate from other wiring.
  12. Thread the line set through the wall to the indoor unit.
  13. Bend tubing only with a correctly sized bender; do not bend more than 90° or more than 3 times.

Applies to: D5FUAA refrigerant piping

More air handler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: D5FUAA installation instructions, p. 39-40. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.