Carrier · Air handler troubleshooting
Pre-test run checks
What is going on
Confirm the installation is complete before the first test run.
Check in this order
- Confirm the indoor and outdoor units are properly installed.
- Confirm piping and wiring are connected correctly.
- Clear any obstacles near the unit inlet and outlet.
- Confirm the refrigeration system has no leaks.
- Confirm the drain is clear and drains to a safe place.
- Confirm piping and duct insulation is installed.
- Confirm the grounding wires are connected.
- Record the piping length and any additional refrigerant charge.
- Confirm the power supply voltage matches the air conditioner rating.
Applies to: D5FUAA 18K to 60K
More air handler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: D5FUAA installation instructions, p. 42. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.