Carrier · Air handler troubleshooting
Mounting the indoor unit (install guide)
What is going on
The unit may stand or lie on the floor, or hang from a ceiling or wall. Plan space for wiring, piping and service. The unit can be vertical (down flow or up flow) or horizontal (right or left). The structure holding the unit must support its full weight.
Check in this order
- Confirm the unit matches the rating plate and job specs.
- Check the location has room for service, line set, drain pipe and airflow.
- Confirm the structure can carry the full weight of the unit.
- Keep the air inlet and outlet unobstructed and away from direct heater radiation.
- Choose vertical or horizontal mounting per the layout.
- For horizontal installs, install a secondary drain pan (not supplied).
- Where the unit is over a finished ceiling or living area, install a field-supplied secondary condensate pan under the whole unit or run a separate secondary drain line where local code allows.
- Expect nuisance sweating in high humidity with low airflow.
Applies to: All D5FUAA sizes
More air handler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: D5FUAA installation instructions, p. 14. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.