Horizontal left and right coil installation

D5FULA

What is going on

Horizontal coils can sit on a platform, truss, hangers or blocks. The coil cabinet must be level side to side and front to back.

Check in this order

  1. Level the coil cabinet side to side and front to back. Up to 1/2 in of extra slope over the length and depth is allowed toward the drain pan connection.
  2. Right flow attach field attachment plates to the coil casing with self-tapping screws, then connect the furnace snugly and fasten it.
  3. Left flow bend the 4 tabs on the right side of the casing, connect the furnace snugly and fasten it with self-tapping screws.
  4. For either side, seal the joint airtight with an approved material.
  5. If the coil is wider than the furnace, use a 4 in minimum transition.

Applies to: D5FULA horizontal installs

More air handler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Carrier D5FULA installation instructions, p. 22. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.