Flammable refrigerant work: area checks before opening the system

D5FSAA / D5FLAA

What is going on

General safety sequence for work on R-32 type A2L flammable refrigerant systems.

Check in this order

  1. Check the area with an appropriate refrigerant detector before and during work.
  2. Use leak detection equipment suitable for flammable refrigerants (no sparking, sealed or intrinsically safe).
  3. Have a dry powder or CO2 fire extinguisher next to the charging area if any hot work is done.
  4. Survey the area for ignition sources. Keep smoking and open flames well away, and post 'No Smoking' signs.
  5. Make sure the area is open or well ventilated before breaking into the system or doing hot work, and keep ventilation running during the work.
  6. Check that refrigerant-containing parts are installed where corrosion is unlikely.

Applies to: Indoor and outdoor units using flammable refrigerant

More air handler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Carrier D5FSAAH / D5FLAAH installation manual, p. 8. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.