Flammable refrigerant field joint testing and pressure/vacuum checks
What is going on
Requirements for field-made refrigerant pipe connections on R454B split systems. Applies before charging and before commissioning.
Check in this order
- Pressure test field piping with inert gas: the low side at its design pressure and the high side at its design pressure, or the whole system at the low side design pressure if the high side cannot be isolated.
- After removing the pressure source, hold the test pressure for at least 1 hour with no drop on the gauge. Gauge resolution must not exceed 5% of test pressure.
- Evacuate the system. Once the specified vacuum is reached, isolate the pump; pressure must not rise above 1500 microns within 10 minutes. Use the lesser of 500 microns or the value required by local code.
- Test field-made joints indoors with a detector sensitive to 5 g/year or better, at a pressure of at least 0.25 times maximum allowable pressure. No leak is allowed.
- Do not use detachable joints on the indoor side of the unit. Brazed or welded joints are allowed.
- Keep all field joints accessible for inspection before they are covered or enclosed.
- Recharge only after pressure testing with oxygen-free nitrogen. Leak test again after charging and before leaving the site.
Applies to: Field piping and joints on R454B split systems
More air handler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Carrier D5FS(L)AAH owner's manual, p. 5. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.