Carrier · Air handler troubleshooting

Final assembly after reorientation

D5FSAAD5FLAA

What is going on

Finish the mechanical and electrical work and close the unit.

Check in this order

  1. Assemble the evaporator in place.
  2. Attach the room temperature sensor with cable ties.
  3. Reinstall the evaporator cover plate.
  4. Connect the wiring according to the wiring diagram.
  5. Reassemble the upper cover and reinstall the filter cover plate.
  6. Connect the pipes and install the drain pipes.

Applies to: D5FSAA / D5FLAA air handler

More air handler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Carrier D5FSAA/D5FLAA installation manual, p. 22. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.