Carrier · Air handler troubleshooting

Electrical control box removal

D5FUHA

What is going on

Procedure to remove the electric control box subassembly and the boards it holds. Anti-static gloves must be worn.

Check in this order

  1. Remove the 4 screws of the upper cover plate assembly and remove the plate.
  2. Remove 3 screws and unplug the plugs.
  3. Pull out the electric control box subassembly.
  4. Unplug the power cord and remove the electric control box subassembly.
  5. Unplug the wires.
  6. Release 2 clips and remove the data transfer module control board.
  7. Release 3 clips and remove the installation plate for the main board.
  8. Unplug the wires.
  9. Release 2 clips and remove the main control board subassembly.
  10. Remove 2 screws and remove the transformer.
  11. Remove 4 screws and remove the installation plate.
  12. Remove the fan drive board.

Applies to: D5FUHA air handler electrical control box

More air handler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: D5FUHA service manual, p. 42-44. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.