Carrier · Air handler troubleshooting
Convert to vertical down or horizontal right: panel removal
What is going on
Follow this sequence to open the unit for downflow or horizontal right wiring and piping.
Check in this order
- Open the upper cover.
- Open the electronic control box cover.
- Remove the filter door, then take the filter out.
- Remove the upper cover assembly.
- Remove the evaporator cover plate.
- Remove the bottom cover first, then the second cover plate.
- Connect the wiring to the wiring diagram.
- Connect the refrigerant pipes and install the drain pipes.
Applies to: D5FSAA / D5FLAA air handler, downflow and horizontal right
More air handler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Carrier D5FSAA/D5FLAA installation manual, p. 19. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.