Carrier · Air handler troubleshooting

Convert to vertical down or horizontal right: panel removal

D5FSAAD5FLAA

What is going on

Follow this sequence to open the unit for downflow or horizontal right wiring and piping.

Check in this order

  1. Open the upper cover.
  2. Open the electronic control box cover.
  3. Remove the filter door, then take the filter out.
  4. Remove the upper cover assembly.
  5. Remove the evaporator cover plate.
  6. Remove the bottom cover first, then the second cover plate.
  7. Connect the wiring to the wiring diagram.
  8. Connect the refrigerant pipes and install the drain pipes.

Applies to: D5FSAA / D5FLAA air handler, downflow and horizontal right

More air handler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Carrier D5FSAA/D5FLAA installation manual, p. 19. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.