Carrier · Air handler troubleshooting
Coil interface and control box mounting
What is going on
Mounting the control box and cutting the wire opening on the coil interface.
Check in this order
- Choose the install location, giving priority to the front of the coil; side or nearby wall is acceptable.
- Use a flat-head screwdriver at the marked positions to open the control box cover.
- Fold the flange up 90 degrees with bending pliers, then fold the flanges around the opening.
- Seal all flange sides with tape and insulate with sponge.
- Attach the control box with 3 screws into the pre-drilled holes (right or left side).
- Use only the supplied screws or equivalent; maximum screw length is 5/8 in (16 mm) to avoid coil damage (see Table 6).
- Cut the cover port only as needed for the wires: a single cut for one wire, or cut along the maximum outline for multiple wires.
- Close the control box cover.
Applies to: D5FULA
More air handler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: D5FULA installation instructions, p. 25-26. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.