Upflow coil installation

DLFULA

What is going on

Set the cased coil on the furnace discharge opening and check that it is level.

Check in this order

  1. Set the coil on the upflow furnace discharge air opening.
  2. Check that the coil is level for proper condensate drainage. Do not tip it toward the drain.
  3. The casing does not need to be fastened to the furnace.
  4. If a wider coil sits on a narrower furnace, build a field-fabricated adapter.
  5. Keep at least 4 in. clearance as shown in the figures on the coil and furnace.
  6. If the coil is in an unconditioned space, wrap a 6 in. wide insulation strip around the casing and supply duct contact point.

Applies to: Upflow installations

More air conditioner guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: DLFULA Installation Instructions, pp. 10, 12. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.